Sequencing decides the timeline
Electrical before ceiling, ceiling before paint, paint before modular. Get that order wrong and you repaint a room twice. On a 3 BHK that mistake costs about a week.
60 daysTypical install
More rooms means more sequencing, more trades and more that can slip. That is exactly what a single accountable team is for.
Full interiors for a 3 BHK in Bengaluru cost roughly ₹6.5 lakh to ₹15 lakh, and a 4 BHK ₹9 lakh to ₹22 lakh. That covers modular kitchen, wardrobes in every bedroom, TV and crockery units, false ceilings and complete painting, delivered in about 60 days.
The design is not the hard part. Sequencing five trades across eight rooms is.
Electrical before ceiling, ceiling before paint, paint before modular. Get that order wrong and you repaint a room twice. On a 3 BHK that mistake costs about a week.
The master carries the budget, the kids room carries the durability, the guest room carries the least. Spreading spend evenly across four bedrooms is the most common way people overspend.
At this size the dining room stops being an afterthought. A crockery unit with a bar section is the piece guests actually see, and it is worth more than a fourth false ceiling.
Five trades, sixty days, one flat. Every family we take on gets a single project manager whose number you have, because chasing four contractors is the part that exhausts people.
Finishes are what you see. These decide whether it is still tight in year eight.
Boiling-water-resistant ply throughout, upgraded to BWP anywhere near water. We do not build carcasses from MDF or particle board.
The edge is where furniture ages first. Thin 0.45mm banding lifts within two monsoons; 2mm survives a decade of being knocked by a vacuum cleaner.
On every hinge and channel, not only the display doors. Rated for around 50,000 cycles.
Every panel, before it reaches you. On ground and first floors across Bengaluru this is what separates a ten-year unit from a four-year one.
One team, one timeline, one person answering your calls.
A designer measures the actual room and asks what goes into it. Planning starts from what you own, not from a catalogue drawing.
You see it in 3D with finishes applied. Nothing goes to the factory until you have signed the drawing and the price.
CNC-cut, edge-banded and pre-assembled off site. No cutting in your flat, no dust in your rooms.
Installed, levelled and handed over with the snag list closed. The warranty starts at handover.
Kitchen, wardrobes in every bedroom, TV and crockery units, ceilings and full painting.
A complete 3 BHK in laminate finishes. BWR ply, soft-close throughout, ceilings in living and dining.
The common choice for a 3 or 4 BHK. Acrylic kitchen, lofts everywhere, crockery unit, designer lighting.
Veneer and PU throughout, Blum hardware, full cove lighting, custom furniture and a walk-in closet.
| What you get | Essential | Premium | Luxe |
|---|---|---|---|
| Starting price | ₹6.5L | ₹11L | ₹22L |
| Modular kitchen | Yes | Yes | Yes |
| Wardrobes in all bedrooms | Yes | Yes | Yes |
| TV unit | Yes | Yes | Yes |
| Living and dining ceiling | Yes | Yes | Yes |
| Full painting | Yes | Yes | Yes |
| 10-year warranty | Yes | Yes | Yes |
| Crockery and bar unit | — | Yes | Yes |
| Lofts above all wardrobes | — | Yes | Yes |
| Study or home-office unit | — | Yes | Yes |
| Designer lighting | — | Yes | Yes |
| Veneer or PU finishes | — | — | Yes |
| Walk-in closet in the master | — | — | Yes |
| Cove lighting throughout | — | — | Yes |
| Custom loose furniture | — | — | Yes |
Ranges assume a standard builder shell with no structural changes. Villas and duplexes are quoted separately.
Two floors, a staircase, and a different set of problems.
See villa interiorsBetween ₹6.5 lakh and ₹15 lakh for a complete job. Most families land between ₹9 lakh and ₹11 lakh. The biggest single variable is kitchen shutter finish, which alone can move the total by ₹1.5 lakh.
About 60 days from design sign-off, assuming no civil work. The critical path is almost always the kitchen: it is the longest factory build and it cannot start until electrical and plumbing points are final.
No. Put the budget in the master and the kitchen, spec the kids room for durability rather than finish, and keep the guest bedroom simple. Even spending across four bedrooms is the most common overspend we see.
We handle tiling, plumbing, electricals and waterproofing under our renovation service. Structural changes need association approval and a structural engineer, and we will tell you when that is the honest answer rather than working around it.
Our on-time guarantee applies: if we miss the committed handover date for reasons within our control, we pay. The date is set after the site measure, not before, so it is a real commitment rather than a sales number.
Plywood grades quoted here follow IS 303 (BWR) and IS 710 (BWP, marine grade), and every estimate is exclusive of the 18% GST that applies to modular work. What these grades and terms actually mean →
We work across Bengaluru — Whitefield to Yelahanka, Electronic City to Hebbal.
We will come back with a room-by-room scope and a number you can hold us to.
Written on-time guarantee · 10-year warranty
Free consultation + 3D design of your own floor plan. Fill in to unlock the offer.
No spam. Your number stays private. By continuing you agree to our Terms & Privacy Policy.