Strip-out and disposal
Removing an old kitchen, dealing with the adhesive residue and disposing of it adds ₹25,000–₹60,000 before any new work begins. It is invisible in the result and unavoidable.
21–35 daysTypical job
Replacing a kitchen is not the same as ordering one. The old one has to come out, and what is behind it is rarely what you hoped.
A full kitchen renovation in Bengaluru costs ₹1.6 lakh to ₹6.5 lakh. That covers stripping out the old kitchen, electrical and plumbing rework, waterproofing behind the sink wall, tiling, and a new modular kitchen. Roughly 25–30% of the cost is the work you never see.
Four things that do not exist in a fresh builder shell.
Removing an old kitchen, dealing with the adhesive residue and disposing of it adds ₹25,000–₹60,000 before any new work begins. It is invisible in the result and unavoidable.
Builder kitchens were wired for one small appliance. An induction hob, a dishwasher, an oven and a chimney together need dedicated circuits, and often a heavier supply cable back to the board.
Damp behind the sink wall, cracked tiles, uneven plaster. We survey before quoting, but some of it only appears once the old kitchen is out, so we agree a contingency rather than surprise you.
Three to five weeks without a kitchen. We set up a temporary point with the fridge, a microwave and a kettle away from the work, because that detail matters more to families than any finish.
Renovation failures are almost always sequencing or preparation, not materials.
Every appliance you plan to own is counted before we decide what the supply and circuits need to be.
The wall behind a kitchen sink is a wet wall. Treated before tiling, the same as a bathroom.
Modular units need a level floor and a plumb wall. Correcting after delivery means shimming, and shimmed kitchens develop gaps.
The modular kitchen is being made while the civil work happens, so installation starts the day the site is ready.
Sequenced so nothing has to be done twice.
A site visit that records what is actually there, not what the plan says. Older buildings hide surprises and we would rather find them before quoting than after starting.
Civil, plumbing, electrical, waterproofing, then finishes. Renovation goes wrong when trades overlap in the wrong order, and that order is not negotiable.
One project manager, one WhatsApp group, daily photographs. You know what happened on site every day without having to ask.
Snag list closed in writing, debris cleared to the building's designated point, and every warranty document handed over together.
Complete, including strip-out, services rework and the new modular kitchen.
Strip-out, minor electrical rework, retile the backsplash, laminate modular kitchen.
Full services rework, wet-wall waterproofing, new floor and backsplash, acrylic modular kitchen.
Complete rebuild with layout change, upgraded supply, quartz counter, veneer or PU modular kitchen.
| What you get | Essential | Premium | Luxe |
|---|---|---|---|
| Starting price | ₹1.6L | ₹3.2L | ₹6.5L |
| Strip-out and disposal | Yes | — | — |
| Backsplash retile | Yes | — | — |
| Minor electrical rework | Yes | — | — |
| Laminate modular kitchen | Yes | — | — |
| Full electrical and plumbing rework | — | Yes | — |
| Wet-wall waterproofing | — | Yes | — |
| New floor and backsplash | — | Yes | — |
| Acrylic modular kitchen | — | Yes | — |
| Tandem drawers and magic corner | — | Yes | — |
| Layout change | — | — | Yes |
| Upgraded supply and board | — | — | Yes |
| Quartz countertop | — | — | Yes |
| Veneer or PU shutters | — | — | Yes |
| Blum hardware | — | — | Yes |
Countertop, chimney, hob and sink are itemised separately so you can compare like for like. Appliances are not included.
₹1.6 lakh to ₹6.5 lakh complete. Roughly 25–30% is strip-out, electrical and plumbing rework, and waterproofing — the work you never see but cannot skip.
Three to five weeks. We set up a temporary point with your fridge, microwave and kettle clear of the work area, and we sequence so the water supply is off for hours rather than days.
Strip-out and disposal alone add ₹25,000–₹60,000. On top of that, builder wiring rarely supports a modern appliance set, and there is usually damp or damage behind the old units that has to be dealt with.
Sometimes, and it saves real money. But if you are adding an induction hob, a dishwasher or an oven, the existing circuits almost certainly cannot carry them, and we would rather upgrade than overload.
Within limits. Moving the sink more than about two feet runs into drain slope, and moving the chimney needs a duct route. Both are decided at survey, not after you have paid.
We work across Bengaluru, and we quote after seeing the site — never over the phone.
Including under the sink. That is usually where the surprises are.
Written on-time guarantee · 10-year warranty
Free consultation + 3D design of your own floor plan. Fill in to unlock the offer.
No spam. Your number stays private. By continuing you agree to our Terms & Privacy Policy.