The load has changed
Builder wiring assumed one AC and no induction hob. Add two ACs, a geyser, a dishwasher and an oven and the original 4mm mains is undersized. We calculate actual load before deciding what can be reused.
7–20 daysPer point
Wires and pipes disappear behind walls for the next twenty years. This is the stage where shortcuts are permanent.
Electrical points in Bengaluru cost ₹450 to ₹900 per point including conduit, wiring and switch. Plumbing points run ₹900 to ₹1,400 per point. A full 2 BHK rewire typically lands between ₹65,000 and ₹1.4 lakh depending on point count and wire grade.
A ten-year-old Bengaluru flat was wired for a different set of appliances than you own.
Builder wiring assumed one AC and no induction hob. Add two ACs, a geyser, a dishwasher and an oven and the original 4mm mains is undersized. We calculate actual load before deciding what can be reused.
Sockets get planned after the furniture layout is fixed, not before. A socket behind a wardrobe is a socket you have paid for and lost.
Casing-capping surface conduit is cheaper and looks it. Concealed PVC conduit chased into the wall means a future rewire is possible without breaking the wall again.
Every circuit gets an insulation and continuity test before plastering. Finding a nicked cable after the wall is painted means opening it back up.
Every failure we get called to fix started with one of these being skipped.
Water gets in at the 90-degree wall-to-floor corner. Rounding it into a fillet before the membrane goes on is the step most often skipped.
Corners, pipe penetrations and drain outlets get fibreglass mesh embedded in the first coat. These are where every failure we are called to fix started.
Second coat at 90 degrees to the first, so a thin patch in one is covered by the other. Single-coat application is not waterproofing.
We flood it and watch it. Testing after the tiles are down means breaking a finished floor to find the leak.
Everything is tested before it disappears behind plaster.
A site visit that records what is actually there — not what the plan says. Old buildings hide surprises and we would rather find them before quoting.
Civil, plumbing, electrical, waterproofing, then finishes. Renovation goes wrong when trades overlap in the wrong order.
One project manager, one WhatsApp group, daily photographs. You always know what happened on site that day.
Snag list closed in writing, debris removed, and every warranty document handed over together.
Including conduit, wiring, accessories and testing.
Standard electrical point: concealed conduit, FR wire, modular switch.
Premium point with FRLS wire, branded modular plate, dedicated circuits for high-load appliances.
Plumbing point or specialist circuit: CPVC/UPVC line, concealed valves, pressure tested.
| What you get | Essential | Premium | Luxe |
|---|---|---|---|
| Starting price | ₹450/point | ₹700/point | ₹1,400/point |
| Concealed PVC conduit | Yes | — | — |
| FR-grade copper wire | Yes | — | — |
| Modular switch and plate | Yes | — | — |
| Circuit testing | Yes | — | — |
| FRLS low-smoke wire | — | Yes | — |
| Branded modular accessories | — | Yes | — |
| Dedicated appliance circuits | — | Yes | — |
| Upgraded MCB board | — | Yes | — |
| CPVC hot and cold lines | — | — | Yes |
| Concealed valves | — | — | Yes |
| Pressure test at 6 bar | — | — | Yes |
| Full documentation | — | — | Yes |
A full 2 BHK rewire typically runs ₹65,000–₹1.4 lakh. We quote by point count after a site survey, never over the phone.
It depends on the mains and the board. If the incoming cable and MCB board can carry your actual load, adding points is fine. If you are adding a second AC, an oven or an induction hob to builder wiring, the mains usually needs upgrading first.
Typically 55–75 points including lights, fans, sockets and appliance circuits. Builder flats often come with 35–45, which is why so many homes end up on extension boards.
FR as a minimum, FRLS if you can stretch to it. FRLS produces far less toxic smoke in a fire, which matters in a flat where the exit is a single corridor. The cost difference across a 2 BHK is roughly ₹8,000.
Within a bathroom, usually yes, for a couple of feet. Moving a WC significantly, or moving a bathroom to a new location, means changing the drain stack — which needs association approval and is often refused. We flag this early rather than after you have paid.
Our electrical work is carried out by licensed electricians and every circuit is insulation-tested before the wall is closed. You get the test record and the wiring layout at handover, which matters when you next need to drill a wall.
We work across Bengaluru, and we quote after seeing the site — not over the phone.
If a breaker goes when the geyser and the AC run together, that tells us more than a floor plan does.
Written on-time guarantee · 10-year warranty