Damp has to be found first
A patch that keeps returning is a leak, not a paint failure. We meter-test suspect walls before quoting, because painting over active damp wastes your money within a year.
4–9 daysTypical job
Most repaints fail because of what was underneath, not what went on top. We test the wall before we quote it.
Interior repainting in Bengaluru costs ₹18 to ₹38 per square foot of wall area, including putty, primer and two topcoats. A 2 BHK typically runs ₹32,000–₹70,000. Repainting is cheaper than fresh painting only when the existing surface is sound.
Almost never the paint. Almost always the wall under it.
A patch that keeps returning is a leak, not a paint failure. We meter-test suspect walls before quoting, because painting over active damp wastes your money within a year.
Rub a finger on an old distemper wall — if it powders, nothing will bond to it. That surface needs scraping back, and a quote that does not mention it is not a real quote.
Scraping, filling, two coats of putty and sanding takes longer than the painting. A crew that finishes a 2 BHK in three days did not do this part.
Full sheeting, taped floors, one or two rooms at a time, and cleaned at the end of each day. Repainting an occupied home is as much logistics as it is painting.
Every failure we get called to fix started with one of these being skipped.
Wall putty fills the pinholes that make a finished wall look patchy under evening light. One coat rushed is the most common corner cut.
Using a cheap primer under a premium emulsion voids the paint warranty and costs you a third coat. We use the same manufacturer's system throughout.
Over-thinning stretches a bucket further and thins your coverage. Our teams dilute by measure, not by eye.
Full sheeting, taped edges, and a cleaned site at the end of each day. You are living in the house while we work.
Room by room, so you always have somewhere to sleep.
A site visit that records what is actually there — not what the plan says. Old buildings hide surprises and we would rather find them before quoting.
Civil, plumbing, electrical, waterproofing, then finishes. Renovation goes wrong when trades overlap in the wrong order.
One project manager, one WhatsApp group, daily photographs. You always know what happened on site that day.
Snag list closed in writing, debris removed, and every warranty document handed over together.
Wall area, not floor area. Includes putty, primer and two topcoats.
Standard emulsion with one coat of putty where needed, primer and two topcoats.
Premium washable emulsion, two full coats of putty, sanded, primer and two topcoats.
Low-VOC or stain-resistant emulsion with full surface rebuild and colour consultation.
| What you get | Essential | Premium | Luxe |
|---|---|---|---|
| Starting price | ₹18/sq ft | ₹26/sq ft | ₹38/sq ft |
| Crack filling | Yes | — | — |
| Putty where required | Yes | — | — |
| Primer coat | Yes | — | — |
| Two topcoats | Yes | — | — |
| Site cleaning | Yes | — | — |
| Two full putty coats | — | Yes | — |
| Machine sanding | — | Yes | — |
| Washable emulsion | — | Yes | — |
| Furniture protection | — | Yes | — |
| Daily cleaning | — | Yes | — |
| Low-VOC paint | — | — | Yes |
| Full surface rebuild | — | — | Yes |
| Colour consultation | — | — | Yes |
| Feature wall included | — | — | Yes |
Wall area is typically 3–3.5× your carpet area. We measure rather than estimate, so the quote does not move later.
Interiors every 4–6 years with a quality emulsion, kitchens and bathrooms sooner. If you are repainting more often than that, the cause is usually surface preparation or damp rather than the paint.
By wall area, not floor area. As a rule of thumb, wall area is roughly 3 to 3.5 times your carpet area. We measure the actual walls, so the number in the quote is the number you pay.
Not honestly. Any paint over active damp will bubble and stain again within months. We meter-test the wall, find the source — usually a bathroom on the other side or an external wall junction — and fix that first.
No. We work one or two rooms at a time, sheet everything, and clean daily. Most families stay throughout. Low-VOC paints are worth the small premium if anyone in the house has asthma.
Between 4 and 9 days depending on surface condition. If a crew quotes you three days for a full 2 BHK, they are skipping putty and sanding — which is exactly the part that makes the finish last.
We work across Bengaluru, and we quote after seeing the site — not over the phone.
Especially anything with a stain or a bubble. That decides the scope.
Written on-time guarantee · 10-year warranty
Free consultation + 3D design of your own floor plan. Fill in to unlock the offer.
No spam. Your number stays private. By continuing you agree to our Terms & Privacy Policy.